The Friday Newsflash - January 30, 2026

df1ba960-7daf-60bf-af36-9bfda57ee666
Dates to Remember 

Community Engagement Updates Senior Center Updates
  • Cancelled classes next week: Tuesday 2/3 Mindful Movement and Thursday 2/5 Chair Yoga
  • Worked on finalizing February event calendar and menu
  • Started planning interest surveys for senior programs
  • Planned for winter weather rescheduling
  • February Activity Calendar

Project Updates
Current projects can be found on our website at Smithville, MO

Maintenance Updates

  • Parks
    • Plowed snow through the weekend and cleaned up the streets
    • Cleared snow from parking lots, trails, and sidewalks
    • Continued maintenance on equipment
    • Made minor repairs in the senior center
  • Streets
    • Prepared and inspected trucks prior to the weekend winter event
    • Plowed and treated city streets throughout the storm and during overnight refreeze conditions, performed follow-up checks to ensure no areas were missed
      • 103.95 ton of salt used, 3,100 gals of brine made, and 2,600 gals of brine used. 
    • Performed vehicle maintenance
    • Crews inspected and repaired storm boxes throughout multiple subdivisions. Mortar and dirt used as needed for stabilization and repairs
      • Several locations identified for future follow-up (lid removal or vacuuming)
    • Completed KCMPMA Plumbing Training
    • Investigated reported pothole concerns on Jolisa Court
    • Straightened stop sign at Woods and Winner (replacement planned after ground thaws)
    • Pulled backhoe into shop and replaced fuel filter (water separator filter pending)
  • Utilities
    • Total Drinking Water Production 6,728,000 gal and treated 4,521,000 gallons of wastewater
    • Completed all testing required at the WTP and WWTP
    • Conducted weekly chemical level checks at the WTP for ordering
    • Crews completed a full inspection on the Southwest Tower
    • Back washed filters 1,2,4, and 5
    • Repaired leak on the permanganate feed line at the raw water station
    • Repaired a leak on the transducer line at the North tower
    • Completed 14 work orders, 64 locates completed
    • Completed weekly checks of all booster station and towers in the distribution system
    • Reported to 3 frozen meter complaints
    • Repaired a broken cable on digestor #2
    • Repaired a water main break at East Meadow
    • Reported to a sewer backup after hours on Liberty Street. The main was not backed up
    • Cleared snow at City Hall parking lot on Sunday and shoveled the back walkway
    • Repaired pump #1 air relief at Rollins Landing lift station
    • Replaced pump #2 air compressor for the vacuum prime system at Quail Ridge lift station
    • Repaired equipment and facilities due to winter weather